Ahpra's 2024/25 annual report says the average time to complete a notification "is the lowest recorded since the start of the scheme", and the CEO writes that it has fallen "37% from its peak". The report gives neither the average nor the peak. The last average published in an annual report was 180 days, for 2020/21.
Sources: AR 2024/25 pp 6, 71; AR 2020/21 p 78.